「The hotel has been going through a remodeling process. The 2nd floor was basically under construction. The fitness center, swimming pool and all other amenities on the first floor were being used to store construction materials. There was no patio area for lounging outside. There was no bench or any other seating area in front of the hotel so if a person was waiting for a ride there was no place to sit. As for the remodel process, we were on the 3rd floor which I guess had been completed. ...
「The hotel has been going through a remodeling process. The 2nd floor was basically under construction. The fitness center, swimming pool and all other amenities on the first floor were being used to store construction materials. There was no patio area for lounging outside. There was no bench or any other seating area in front of the hotel so if a person was waiting for a ride there was no place to sit. As for the remodel process, we were on the 3rd floor which I guess had been completed. ...
James